MILL POINT CLOSE
South Perth
Situated on the South Perth foreshore, structural design and supervision was undertaken on this four-storey house, It was constructed using precast concrete panels and transfloor concrete slabs, with steel members used for the flooring system.
The structural design allowed for a pool situated on the first floor and a rear void which had multi-level glass mezzanine floors around the perimeter. An earthquake stability check resulted in the installation of ten by 20 tonnes tension piles, which were tied into the tilt panels.
Project Summary
Commenced:
June 2006
Completed:
January 2010
Sept
Services Provided:
Structural Design and Construction Supervision